Yaqui Project Design services included mechanical design, controls and control system design. A 3.6 Km route with three flights including one 3.0 Km overland and two smaller sections ( 500 m, 120 m ) for transporting limestone. The 3.0 Km overland and 500 m sections have downhill designs.
Year of Construction: | 1990 |
Location: | Cementos Mexicanos, Yaqui Project, Mexico |
Length (Tail to Head): | 3.6 km |
Power: | 818 kW |
Capacity: | 1,360 tph |
Strength: | ST-2450, EP-525, and EP-1400 N/mm |
Speed: | 2.4 m/s |
Material: | Limestone |