Yangquan Project Pipe Conveyor Design - Project scope included belt design and system evaluation for a 8.1 km pipe conveyor.
Year of Construction: | 2014 |
Location: | Yangquan - China |
Length (Tail to Head): | 8.1 km |
Power: | 5000 kW |
Capacity: | 1000 tph |
Strength: | ST-2500 N/mm |
Speed: | 4.0 m/s |
Material: | Coal |