Yandi Overland Conveyor

Yandi Project Design included mechanical design, control design, commissioning, and chute designs.

Year of Construction: 2003
Location: Yandi Ore handling – Pibara, Australia
Length (Tail to Head): 5.1 km
Power: 2,250 kW
Capacity: 4000 tph
Strength: ST-1900 N/mm
Speed: 5.5 m/s
Material: Iron Ore
Interesting Features:
  • Feed chute design for Voest-Alpine

Follow Us