Yandi Project Design included mechanical design, control design, commissioning, and chute designs.
Year of Construction: | 2003 |
Location: | Yandi Ore handling – Pibara, Australia |
Length (Tail to Head): | 5.1 km |
Power: | 2,250 kW |
Capacity: | 4000 tph |
Strength: | ST-1900 N/mm |
Speed: | 5.5 m/s |
Material: | Iron Ore |