Trombetas Project Design services for 7 overland conveyor included mechanical design, downhills, control logic for stopping and starting, instrumentation, supervisory system, and forensic testing.
223-06 | 220-12 | 220-13 | 220-15 | 220-17 | 220-18 | 220-19 | |
Year of Construction: | 1997 | ||||||
Location: | Trombetas – MRN, Brazil | ||||||
Length (Tail to Head): | 2.415 km | 2.415 km | 1.924 km | 1.578 km | 3.392 km | 2.860 km | 2.195 km |
Power: | 6,750 kW | 6,750 kW | 6,750 kW | 6,750 kW | 6,750 kW | 6,750 kW | 6,750 kW |
Capacity: | 3,123 tph | 3,123 tph | 3,123 tph | 3,123 tph | 3,123 tph | 3,123 tph | 3,123 tph |
Strength: | ST-1500, ST-1600, ST-2250, ST-2600 N/mm | ST-1500, ST-1600, ST-2250, ST-2600 N/mm | ST-1500, ST-1600, ST-2250, ST-2600 N/mm | ST-1500, ST-1600, ST-2250, ST-2600 N/mm | ST-1500, ST-1600, ST-2250, ST-2600 N/mm | ST-1500, ST-1600, ST-2250, ST-2600 N/mm | ST-1500, ST-1600, ST-2250, ST-2600 N/mm |
Speed: | 4.2 m/s | 4.2 m/s | 4.2 m/s | 4.2 m/s | 4.2 m/s | 4.2 m/s | 4.2 m/s (KC-2C) |
Material: | Bauxite |