Trombetas Project

Trombetas Project Design services for 7 overland conveyor included mechanical design, downhills, control logic for stopping and starting, instrumentation, supervisory system, and forensic testing.

223-06 220-12 220-13 220-15 220-17 220-18 220-19
Year of Construction: 1997
Location: Trombetas – MRN, Brazil
Length (Tail to Head): 2.415 km 2.415 km 1.924 km 1.578 km 3.392 km 2.860 km 2.195 km
Power: 6,750 kW 6,750 kW 6,750 kW 6,750 kW 6,750 kW 6,750 kW 6,750 kW
Capacity: 3,123 tph 3,123 tph 3,123 tph 3,123 tph 3,123 tph 3,123 tph 3,123 tph
Strength: ST-1500, ST-1600, ST-2250, ST-2600 N/mm ST-1500, ST-1600, ST-2250, ST-2600 N/mm ST-1500, ST-1600, ST-2250, ST-2600 N/mm ST-1500, ST-1600, ST-2250, ST-2600 N/mm ST-1500, ST-1600, ST-2250, ST-2600 N/mm ST-1500, ST-1600, ST-2250, ST-2600 N/mm ST-1500, ST-1600, ST-2250, ST-2600 N/mm
Speed: 4.2 m/s 4.2 m/s 4.2 m/s 4.2 m/s 4.2 m/s 4.2 m/s 4.2 m/s (KC-2C)
Material: Bauxite