Rizhao Project Design included belt design and system evaluation for a 8.0 km pipe conveyor.
| Year of Construction: | 2013 |
| Location: | Rizhao - China |
| Length (Tail to Head): | 8.0 km (3 conveyors) |
| Power: | 10,480 kW |
| Capacity: | 5000 tph |
| Strength: | ST-2500 N/mm |
| Speed: | 5.0 m/s |
| Material: | Iron Ore |