CDI provided the basic engineering design for the 1.88 km pipe conveyor transporting soda ash from storage to ship loading. Despite numerous tight curves through existing infrastructure, no pipe rotation occurred during commissioning, and no idler tilt adjustments were required—a testament to CDI's advanced FEA modeling and commitment to sustainable, dust-free conveying.
| Year of Construction: | 2025 |
| Location: | Chile |
| Length (Tail to Head): | 1.88 km |
| Power: | 3 x 400 kW |
| Capacity: | 1500 tph |
| Strength: | ST-1500 N/mm |
| Speed: | 4.5 m/s |
| Pipe Diameter: | 460 mm |
| Material: | Soda Ash |