The Phosboucraa system was built in 1971. The system had been out of commission for a number of years and was experiencing numerous problems. CDI was contracted to audit the system and identify problems.
Date of CDI Study: | 1996 |
Location: | Morocco |
Length (Tail to Head): | 96 km (11 conveyors) |
Power: | 24,000 kW |
Capacity: | 1,800 tph |
Strength: | ST-3150 N/mm |
Speed: | 4.0 m/s |
Material: | Phosphates |