Nesher Project, in Israel, CDI audited this site with dynamic and forensic testing.
| Year of Construction: | 1997 |
| Location: | Israel |
| Length (Tail to Head): | 2.927 km |
| Power: | 1,000 kW |
| Capacity: | 1,400 tph |
| Strength: | ST-1000 N/mm |
| Speed: | 4.26 m/s |
| Material: | Limestone |