Neptune Terminals Project

Neptune Terminals Project Design included mechanical design of a 160 m pipe conveyor. Additional Forensic work in 2015.

Year of Construction: 2011
Location: Neptune Terminals – Vancouver, BC, Canada
Length : .160 km
Power: 372 kW
Capacity: 3,500 tph
Strength: ST-800 N/mm
Velocity : 4.3 m/s
Material: Potash

Additional Work at Site

Projects on site after initial project completion
 
Year: Type: Scope Description
2015 Forensic Analysis Forensic analysis for high abrasive wear on the belt edge of the inner belt overlap.
Scroll to Top