Neptune Terminals Project Design included mechanical design of a 160 m pipe conveyor. Additional Forensic work in 2015.
| Year of Construction: | 2011 |
| Location: | Neptune Terminals – Vancouver, BC, Canada |
| Length (Tail to Head): | 160 m |
| Power: | 372 kW |
| Capacity: | 3500 tph |
| Strength: | ST-800 N/mm |
| Speed: | 4.3 m/s |
| Material: | Potash |