Mundra Project Design included mechanical design, component specifications, and chute design.
| AD-1C | AD-2C | AD-3C | |
| Year of Construction: | 2010 | ||
| Location: | Mundra Port - India | ||
| Length (Tail to Head): | 2.7 km | 403 m | 3.7 km |
| Power: | 2 x 800 kW | 2 x 250 kW | 4 x 800 kW |
| Capacity: | 6000 tph | ||
| Strength: | ST-1800 N/mm | ST-630 | ST-1800 N/mm |
| Speed: | 7.5 m/s | ||
| Material: | Coal | ||