Iron Ore Canada Project services included static and dynamic analysis, basic engineering, DAQ, vibration analysis, and upgraded control logic.
Year of Construction: | 2015 |
Location: | Labrador City, NL, Canada |
Length (Tail to Head): | 6.1 km |
Power: | 4 x 1200 kW |
Capacity: | 6000 tph |
Strength: | ST-2500 N/mm |
Speed: | 6.0 m/s |
Material: | Iron Ore |