Indo Gulf (Birla Copper) Pipe Conveyor

Indo Project Design services for this 3.12 km downhill pipe conveyor included mechanical design for copper concentrate at 1,600 tph.

Year of Construction: 1999
Location: India
Length (Tail to Head): 3.12 km
Power: 1500 kW
Capacity: 1600 tph
Strength: ST-1600 N/mm
Speed: 4.5 m/s
Material: Copper Concentrate

Follow Us