Gualcamayo Project, Gualcamayo – Yamana Gold, San Juan Province, Argentina, included mechanical system evaluation and commissioning.
| Year of Construction: | 2009 |
| Location: | Gualcamayo – Yamana Gold, San Juan Province, Argentina |
| Length (Tail to Head): | 1626 m |
| Capacity: | 1250 tph |
| Strength: | ST-2500 N/mm |
| Speed: | 3.33 m/s |
| Material: | Gold Ore |