German Creek Project Design – Responsible for mechanical design, control logic for starting and stopping, head tail drive, and commissioning support, in association with Barclay Mowlem.
Year of Construction: | 1995 |
Location: | Australia |
Length (Tail to Head): | 5.2 km |
Power: | 4,480 kW |
Capacity: | 2,200 tph |
Strength: | ST-1120 N/mm |
Speed: | 4.5 m/s |
Material: | Coal |