German Creek Project
German Creek Project Design – Responsible for mechanical design, control logic for starting and stopping, head tail drive, and commissioning support, in association with Barclay Mowlem.
Previous
Next
Year of Construction: 1995
Location: Australia
Length : 5.2 km
Power: 4,480 kW
Capacity: 2,200 tph
Strength: ST-1120 N/mm
Velocity : 4.5 m/s
Material: Coal
Interesting Features:
- The theoretical power analysis agrees within a few percentage points of field measurements.