Essroc Project Design included mechanical design, control design, chute design, and capstan brake supply. We installed a new control system completely replacing the original system the conveyor was commissioned with. We also added brakes and supplied a take-up capstan brake. Furthermore, we updated the belt specifications and analyzed failed pulleys.
| Year CDI became involved: | 2010 |
| Location: | Allentown, PA, USA |
| Length (Tail to Head): | 2.7 km |
| Power: | 6 x 100 kW |
| Capacity: | 907 tph |
| Strength: | ST-936 N/mm |
| Speed: | 2.28 m/s |
| Material: | Limestone / Clinker |