Eastern Range Project Design, in Eastern Range, Australia, included mechanical design, control design, and commissioning.
| Year of Construction: | 2004 |
| Location: | Eastern Range, Australia |
| Length (Tail to Head): | 1.555 km |
| Power: | 250 kW |
| Capacity: | 2,200 tph |
| Strength: | |
| Speed: | 5.0 m/s |
| Material: |