Fujairah Pipe Conveyor Project Design included mechanical design audit, commissioning support, detail design of maintenance trolley.
| Year of Construction: | 2023 |
| Location: | Dibba, UAE |
| Length (Tail to Head): | 4.25 km |
| Power: | 3 x 1200 kW |
| Capacity: | 4400 tph |
| Strength: | ST-1600 N/mm |
| Speed: | 5.5 m/s |
| Material: | Limestone, Gabbro, Clinker |