Collahuasi Project Design included mechanical design audit, chute designs (4 chutes) joint venture with Krupp, and provided control system logic. Additional Forensic work done on site in 2009 and 2011.
115-CV-205 | 115-CV-203 | |
Year of Construction: | 2003 | |
Location: | Chile | |
Length (Tail to Head): | 2799.6 m | 5399.8 m |
Power: | 4 x 2050 kW | 3 x 2050 kW |
Capacity: | 8000 tph | 8000 tph |
Strength: | ST-6300 | ST-6300 |
Speed: | 5.11 m/s | 6.0 m/s |
Material: | Copper Ore |