Bulgaria Project Design included belt design and system evaluation for a 2.7 km pipe conveyor.
Year of CDI Study: | 2010 |
Location: | Maritsa Power, Bulgaria |
Length (Tail to Head): | 2.7 km |
Power: | 1000 kW |
Capacity: | 910 tph |
Strength: | ST-1100 |
Speed: | 4.0 m/s |
Material: | Coal |