BHP Bi-Way Project

BHP Bi-Way Project - Design Audit Services for a 6.7km curved by-way conveyor and a 1.34km tunnel conveyor including static and dynamic analysis.

By-Way Conveyor Tunnel Conveyor
Year of Construction: 1996
Location: Port Hedland, Australia
Length (Tail to Head): 6705 m1340 m
Power: 2x900 kW (head), 900 kW (tail) 4 x 630kw
Capacity: 4,000 tph (Carry), 1000 tph (return) 10,000tph
Strength: ST-2000 N/mmST-2500
Speed: 6.2 m/s4.1 m/s
Material: Iron Ore (carry), Briquettes (return)Iron Ore
Interesting Features:
  • Material on Carry and Return
  • Head and tail drive
  • Horizontal Curves

Follow Us