BHP Bi-Way Project - Design Audit Services for a 6.7km curved by-way conveyor and a 1.34km tunnel conveyor including static and dynamic analysis.
By-Way Conveyor | Tunnel Conveyor | |
Year of Construction: | 1996 | |
Location: | Port Hedland, Australia | |
Length (Tail to Head): | 6705 m | 1340 m |
Power: | 2x900 kW (head), 900 kW (tail) | 4 x 630kw |
Capacity: | 4,000 tph (Carry), 1000 tph (return) | 10,000tph |
Strength: | ST-2000 N/mm | ST-2500 |
Speed: | 6.2 m/s | 4.1 m/s |
Material: | Iron Ore (carry), Briquettes (return) | Iron Ore |